Fact Sheets | 27 July 2018
One of the benefits of building the new Forrestfield line underground is the reduced footprint and impact to the natural environment, local residents and businesses.
Fact Sheets | 26 June 2018
A number of construction sites have been created along the project’s 8.5 km route and each site has potential noise and vibration sources.
Fact Sheets | 26 June 2018
Before works begin, property condition surveys will be completed on buildings adjacent to construction sites.
Fact Sheets | 23 October 2017
The Forrestfield-Airport Link’s two tunnels will be constructed with 54,000 concrete segments. A Forrestfield warehouse has been transformed into a facility to batch the concrete and create segments to line the two tunnels.
Fact Sheets | 7 June 2017
Dewatering involves temporarily lowering the water table to allow soil to be excavated from a work site without it refilling with water. This process will be used in construction of the project's underground station boxes and portals.